Aftermarket Case Studies

Dialed-in: Expedited Pilot Replacement | Houston, TX

Staff at a refinery and chemical plant near downtown Houston, TX, needed to replace more than 70 burner pilots supplied by a competitor of Zeeco. The refinery required like-in-kind replacement burner pilots to ensure proper operation. It also required all equipment to arrive within one week so that installation could occur during a scheduled shutdown. Read more... 

Reverse Engineering Cuts, Cost, & Corrosion | Gulf Coast 

A large chemical plant on the Gulf Coast needed to replace tip and riser components of multiple process burners operating in an olefins unit due to recurring corrosion issues. The original equipment manufacturer (OEM) offered to supply like-in-kind parts for the system, meaning the chemical plant would be purchasing replacements with the same underlying corrosion issues. Read more... 

Record Breaking Delivery: Hurricane Harvey Relief

In August 2017, one of the costliest and most destructive hurricanes in American history, Hurricane Harvey, wreaked havoc on the Gulf Coast of the United States. Cedar Bayou, Texas received a record-high 51.88 inches of rainfall, causing devastating and deadly flash flooding. One large petrochemical facility in this area lost power because of the surging waters. Without power, the facility’s large high-capacity steam assisted flare was incapable of producing steam, resulting in a critically damaged flare tip. Read more…

Tengizchevroil Case Study

As a combustion equipment manufacturer, Zeeco is committed to providing the best solution for individual needs. Depending on the customer, the application or the area of installation those needs can vary between capacity, efficiency, longevity, operational ease or a host of other factors. Read more…

Flare Tip Upgrade

We want to thank Zeeco for an excellent job of building and delivering our new flare tip. The replacement flare tip was very well built and everything we specified was done. The tip was installed very easily and all four (4) pilots lit off on the first attempt.
Read more…

Other Successful Case Studies

Zeeco provides on-time delivery and quality products, even with demanding schedules.
Read more…